| Institutional |
|
Pennington
County Jail Annex |
| |
The
Pennington County Jail project included construction of a new
4-story, 128 bed multi-level security facility with two floors
of shelled space for future development. The addition is currently
under construction next to the existing Public Safety Building
and south of the existing jail. A new connector from the campus
central plant to the facility and a three level parking structure
were also included in the project. |
|
| Lower
Brule Justice Center |
| |
The single-story Lower Brule Justice Center will comprise 37,260
gross square feet of occupancy classification I-3 detention space
on the Lower Brule Reservation in central South Dakota. The facility
will provide for 36 adults and 10 juvenile inmates and will be
built to satisfy BIA and ACC standards. |
*To
read PDF files, download Adobe®
Acrobat® Reader for free.
|